Kenya — 8–10 t/h Compound Fertilizer Granulation Line

Complete compound fertilizer granulation plant for a major Kenyan fertilizer company, from large-silo batching to rotary drum granulation.

KenyaNPK / Compound Fertilizer Line8–10 t/h~USD 370,0002021
Case summary

At a glance

Customer: Fertilizer producer / distributor

Problem: Imported compound fertilizer was costly and supply was unpredictable

Solution: We supplied a complete compound line: PLC batching, rotary-drum granulation, drying, cooling, screening and bagging, engineered as one control loop. The configuration follows the standard route that is most widely proven...

Result: Complete plant delivered and commissioned with installation and training support

Customer typeFertilizer producer / distributor
Industry / project typeNPK / Compound Fertilizer Line
Capacity8–10 t/h
Country / regionKenya
Year2021
Investment~USD 370,000

Start a similar project

Tell us your raw materials, capacity and target market. We will compare your conditions with this project and recommend the right configuration.

Product Inquiry

Tell us about your project — we reply within 24 hours (24/7).

Fields marked * are required. Your inquiry goes directly to our engineering team.

Background

Why the project happened

A fertilizer producer in Kenya commissioned a 8–10 t/h compound fertilizer granulation line. The project was driven by local demand growth, import substitution and the need for a reliable, formula-flexible production route.

The problem

What the customer faced

These are the specific issues the project was built to solve.

  • Imported compound fertilizer was costly and supply was unpredictable
  • Manual batching could not guarantee consistent formula accuracy
  • Granulation stability depended on moisture and process control
  • The plant needed drying, cooling and screening to produce storage-stable granules
  • Operators required simple, dependable control
Constraints

Limits we designed around

Real projects are never ideal. These constraints shaped the configuration and delivery plan.

  • Site utilities (steam/power) and space were fixed before design
  • Project had a defined commissioning window
  • Operator experience was limited, favoring a standard proven route
  • Tropical/humid or hot conditions required matched drying, cooling and packing
Solution

Why we configured it this way

We supplied a complete compound line: PLC batching, rotary-drum granulation, drying, cooling, screening and bagging, engineered as one control loop. The configuration follows the standard route that is most widely proven for this product type, with automation matched to the customer's operating team and formula flexibility. Key highlights delivered: Large silo batching + 2080 rotary drum granulation line.

Large silo batching + 2080 rotary drum granulation line
Execution

How it was delivered

From requirements confirmation to commissioning - the key nodes of this project.

1

Design & layout

Confirmed formula range, capacity, utilities and layout.

2

Fabrication

Batching, granulation, drying, cooling, screening and packing built and no-load tested.

3

Quality & packing

Pre-shipment inspection, calibration and export packing documented.

4

Delivery & installation

Delivered and installed with supervision and operator training.

5

Commissioning

Commissioned and stabilized: granulation moisture, drying temperature and product quality verified.

Challenges

Difficult points and how we solved them

Formula accuracy

PLC batching with per-ingredient scales and recipe management.

Granulation stability

Controlled moisture conditioning and operator training on granulation fundamentals.

Climate/quality

Cooling and screening included to protect granule quality in local conditions.

Results

What changed after delivery

Verifiable changes from this project. Where specific figures are confidential, we state the direction and the evidence.

  • Complete plant delivered and commissioned with installation and training support
  • Stable granule quality for local and export markets
  • Formula flexibility via PLC recipes
  • Capacity expansion path preserved in the layout

Project outcome

Delivered by YUSHUNXIN with installation, commissioning and operator training support.

What similar customers can learn

For producers and distributors, this project shows that a standard, proven compound line with disciplined commissioning delivers predictable quality and a clear expansion path. Confirm formula range, utilities and climate before freezing the configuration.

FAQ

Questions from similar projects

What is included in a complete compound line?
Batching, granulation, drying, cooling, screening, bagging and PLC control, plus layout, installation guidance, commissioning and training. Boiler and civil works are separate scope.
How long does commissioning take?
Typically 2-4 weeks on site for a compound line, including operator training and stabilization of granulation parameters.
Can the line handle different formulas?
Yes - PLC recipe management supports multiple formulas; changeover includes batching recipe selection and cleaning where needed.
Start a similar project

Your conditions, our configuration

The fastest way to a useful answer is to compare your project against this one: raw materials, capacity, bag size, site and destination.

Product Inquiry

Tell us about your project — we reply within 24 hours (24/7).

Fields marked * are required. Your inquiry goes directly to our engineering team.

Related

Solutions, evidence & support

More projects
error: Content is protected !!