Гранулированная органическая линия 3 т/ч для Индонезии

Полная линия из куриного помёта от ферментации до гранул в мешках для агрогруппы Юго-Восточной Азии.

IndonesiaПолная линия органических удобрений3 t/h granular
Case summary

At a glance

Customer: Southeast Asian farm group

Problem: Fresh manure was high in moisture and produced strong odors during storage

Solution: We designed the line around the moisture problem. Groove compost turners with aeration brought the manure to a stable, drier condition; moisture conditioning before granulation protected the granulator; a new-type organi...

Result: Full plant commissioned with on-site training

Customer typeSoutheast Asian farm group
Industry / project typeПолная линия органических удобрений
Capacity3 t/h granular
Country / regionIndonesia

Start a similar project

Tell us your raw materials, capacity and target market. We will compare your conditions with this project and recommend the right configuration.

Product Inquiry

Tell us about your project — we reply within 24 hours (24/7).

Fields marked * are required. Your inquiry goes directly to our engineering team.

Background

Why the project happened

A farm group with a large poultry operation wanted to convert chicken manure from a disposal cost into a saleable granular organic fertilizer, while controlling odor and producing a consistent product for local farmers.

The problem

What the customer faced

These are the specific issues the project was built to solve.

  • Fresh manure was high in moisture and produced strong odors during storage
  • Fermentation was uncontrolled, so product stability and pathogen control were uncertain
  • Previous attempts with a single granulator produced soft, dusty granules
  • No drying or cooling meant granules caked in storage
  • The farm had no trained fertilizer plant operators
Constraints

Limits we designed around

Real projects are never ideal. These constraints shaped the configuration and delivery plan.

  • Available land for fermentation lanes was limited
  • Budget favored a staged investment (fermentation + powder first, granular later)
  • Local electricity was stable but limited in capacity
  • Product had to be simple to operate and maintain on the farm
Solution

Why we configured it this way

We designed the line around the moisture problem. Groove compost turners with aeration brought the manure to a stable, drier condition; moisture conditioning before granulation protected the granulator; a new-type organic granulator was chosen for the fiber content; and a matched dryer, cooler, screener and bagger completed the train. The layout was designed so the customer could start with the powder route and add the granular sections when volumes justified them.

Канальные ворошителиГранулятор органики нового типаСушилка, охладитель, грохот, фасовщик
Execution

How it was delivered

From requirements confirmation to commissioning - the key nodes of this project.

1

Site & material audit

Measured manure quantity, moisture and available land; confirmed fermentation area.

2

Line design

Produced fermentation-to-packing flow with a staged upgrade path.

3

Fabrication

Turners, granulator, dryer, cooler, screener and packer built and tested.

4

Installation & training

Installed with on-site training for farm operators, including fermentation control.

5

Commissioning

Ran at target capacity; granule quality and moisture verified over a full shift.

Challenges

Difficult points and how we solved them

High-moisture manure would overload the dryer

Fermentation and conditioning were treated as the first dewatering step; the dryer was sized on the confirmed moisture basis.

Odor complaints from neighbors

Aeration and turning cycles were optimized; optional bio-filter interface included.

Limited operator experience

Step-by-step training, a simple control philosophy and a documented fermentation schedule.

Results

What changed after delivery

Verifiable changes from this project. Where specific figures are confidential, we state the direction and the evidence.

  • Full plant commissioned with on-site training
  • Consistent granular organic fertilizer with controlled moisture
  • Manure converted from disposal cost to revenue
  • Customer expanded capacity within 2 years using the staged design

Project outcome

Полный завод запущен с обучением на площадке; клиент расширил мощность через 2 года.

What similar customers can learn

For farms converting manure, this case shows that fermentation discipline and moisture management decide the success of the whole line. Plan land and retention time first, start with the powder route if capital is tight, and design for the granular upgrade from day one.

FAQ

Questions from similar projects

How long does fermentation take before granulation?
Typically 20-40 days depending on feedstock, turning frequency and climate. The line design includes retention time so granulation is never starved.
Can I start without the dryer?
If you sell powder product or local wet granules, yes - but storage life and product quality are lower. The staged design lets you add drying/cooling later.
What capacity is realistic on a farm?
1-10 t/h is typical depending on manure volume and land. We size fermentation, not just the granulator, so the whole chain is balanced.
Start a similar project

Your conditions, our configuration

The fastest way to a useful answer is to compare your project against this one: raw materials, capacity, bag size, site and destination.

Product Inquiry

Tell us about your project — we reply within 24 hours (24/7).

Fields marked * are required. Your inquiry goes directly to our engineering team.

Related

Solutions, evidence & support

More projects
error: Content is protected !!