
At a glance
Customer: Organic fertilizer producer in Chile
Problem: Open windrow fermentation took space and time
Solution: YUSHUNXIN supplied the organic fermentation tank as an enclosed system that mixes and aerates the material inside a sealed vessel, shortening fermentation time and containing odor while keeping the footprint compact....
Result: Organic fermentation tank delivered to Chile
| Customer type | Organic fertilizer producer in Chile |
| Industry / project type | Fermentation Tank |
| Capacity | Single equipment |
| Country / region | Chile |
| Year | 2026 |
Start a similar project
Tell us your raw materials, capacity and target market. We will compare your conditions with this project and recommend the right configuration.
Product Inquiry
Tell us about your project — we reply within 24 hours (24/7).
Why the project happened
A Chilean customer ordered an organic fertilizer fermentation tank for enclosed compost fermentation. The tank provides controlled, odor-contained fermentation with a smaller footprint than open windrows.
What the customer faced
These are the specific issues the project was built to solve.
- Open windrow fermentation took space and time
- Odor and process control needed improvement
- Enclosed fermentation required for consistent output
- Export packing for sea freight to Chile
Limits we designed around
Real projects are never ideal. These constraints shaped the configuration and delivery plan.
- Enclosed, odor-contained operation
- Sea freight packing for a large vessel
Why we configured it this way
YUSHUNXIN supplied the organic fermentation tank as an enclosed system that mixes and aerates the material inside a sealed vessel, shortening fermentation time and containing odor while keeping the footprint compact.
How it was delivered
From requirements confirmation to commissioning - the key nodes of this project.
Requirements confirmation
Confirmed feedstock, batch size and daily input with the Chilean buyer.
Engineering & configuration
Sized the tank volume, agitator and aeration for the fermentation cycle.
Fabrication & assembly
Fabricated and assembled the tank with corrosion-resistant contact parts.
No-load testing & export packing
Tested the drive and control system, then export-packed.
Container loading & dispatch
Loaded and shipped to Chile with documents.
Difficult points and how we solved them
Odor containment
Used a sealed vessel with controlled aeration so fermentation is enclosed and odor is contained.
Large-vessel sea freight
Export-packed the tank in modules for container loading.
What changed after delivery
Verifiable changes from this project. Where specific figures are confidential, we state the direction and the evidence.
- Organic fermentation tank delivered to Chile
- Enclosed, odor-contained fermentation configured
- Export-packed and shipped
Project outcome
Fermentation tank shipped to Chile.
What similar customers can learn
An enclosed fermentation tank shortens the cycle and contains odor in a smaller footprint than windrows. Confirm feedstock and daily input first so the volume and aeration are sized correctly.
Questions from similar projects
How does a fermentation tank compare to windrow composting?
Your conditions, our configuration
The fastest way to a useful answer is to compare your project against this one: raw materials, capacity, bag size, site and destination.
Product Inquiry
Tell us about your project — we reply within 24 hours (24/7).