Sistemas de Separación Física de Aguas Residuales Ganaderas | YUSHUNXIN Fertilizer Machinery
Solicite listas de precios y cotizaciones por correo Exportamos a más de 60 países
Menú
Home/Solutions/Sistemas de Separación Física de Aguas Residuales Ganaderas

Sistemas de Separación Física de Aguas Residuales Ganaderas

Separación sólido-líquido en dos etapas para granjas de cerdos, vacas y aves — criba inclinada, separador fino de alta frecuencia, deshidratadora y prensa de husillo.

Southeast AsiaLatin AmericaAfricaMiddle EastEurope
Solution at a glance

Sistemas de Separación Física de Aguas Residuales Ganaderas

La gama de YUSHUNXIN reduce la carga de sólidos suspendidos al frente de su línea de tratamiento: una criba inclinada elimina fibra gruesa y partículas grandes, un separador fino de alta frecuencia (referencia 0,3 mm / malla 150) captura sólidos finos a 30–50 m³/h, y una prensa de husillo deshidrata sólidos concentrados. Esto es separación física y reducción de sólidos — no sustituye un tratamiento biológico o químico completo para cumplir estándares de descarga.

Unidad fina de referencia 30–50 m³/h

Malla 304 de 0,3 mm / malla 150

Intercepción de sólidos ~95% en condiciones de referencia

Límite claro: separación física, no tratamiento de descarga

Why This Line

Why choose this line

Livestock wastewater separation is one of the company's fastest-growing new lines and the honest front-end of manure management: reduce suspended-solids load, recover solids for composting, and shrink the biological or chemical treatment you still need. The engineering boundary is explicit — physical separation, not discharge treatment.

Reference 30–50 m³/h fine separation unit
0.3 mm / 150-mesh 304 stainless screen
~95% solids interception at reference conditions
Two-stage coarse + fine separation
Who this solution is for

Is this solution for you?

Read this first: the solution fits specific customers, scenarios and project stages. If you are not the target, the configuration and quote will not be right.

Suitable for

  • Pig, cattle and poultry farms facing high solids load in wastewater
  • Farms connecting manure solids to composting or organic fertilizer lines
  • Environmental projects that need a reliable front-end load reduction before biological treatment
  • Contractors integrating separation into existing treatment trains

Not suitable / confirm first

  • Customers expecting discharge-compliant water from separation alone (that is biological/chemical treatment scope)
  • Projects without flow, TS/SS data or a defined solids destination
  • Sites with no access for solids removal and dewatering disposal
The problems

What customers face before this solution

These are the real operating problems this line is designed to solve - and why they happen.

Typical problems

  • Raw wastewater carries high suspended solids that clog pumps, pipes and downstream treatment
  • Solids are not recovered, so nutrients and fiber that could feed composting are lost
  • Manual screening is labor-intensive and inconsistent
  • Fine particles pass coarse screens, overloading downstream biological treatment
  • Separated solids are too wet to compost or transport economically
  • Equipment corrodes and clogs because the system was not designed for manure characteristics

Why they happen

  • Only a coarse screen is installed, so fines pass through
  • No primary settling or fine separation stage matched to flow peaks
  • Solids are removed manually with no dewatering, so they are heavy and messy
  • Flow and TS content were never measured, so the system is sized on guesses
  • Dewatering and composting interfaces are not planned, so separated solids have no route
  • Carbon steel contact parts corrode in the aggressive liquid environment

Why a complete line, not single machines

Separation is a chain of particle-size reduction: coarse solids, fine suspended solids and bound water each need a different stage. A single screen or press cannot do all three. A two-stage physical system with dewatering is designed around your flow, TS and fiber profile, and it turns a wastewater problem into a recoverable solids stream.

Process

How the line works

1

Recolección y homogeneización

Bomba de estiércol y paquete de control entregan flujo constante desde fosas.

2

Separación gruesa

La criba inclinada elimina fibra y partículas grandes para proteger las unidades posteriores.

3

Separación fina

El separador fino de alta frecuencia captura sólidos finos (referencia 0,3 mm / malla 150).

4

Deshidratación

La prensa de husillo concentra sólidos finos y lodos con menor humedad.

5

Salida

Los sólidos separados pueden compostarse; el líquido continúa a su tratamiento o almacenamiento.

Solution structure

What is inside the line

Each module solves one part of the chain. Open any module to see its parameters and options.

Configuration logic

Why we configure it this way

Equipment is not a list - it is a response to your conditions. This is how your conditions change the configuration:

When your project is...We configure...
High coarse solidsInclined coarse screen or drum screen as first stage
Fine suspended solidsHigh-frequency fine separator (0.3-0.5 mm) as second stage
Wet solids for compostingVolute screw press or screw dewaterer to reduce moisture
High flow variabilityEqualization tank + variable-speed pumps with flow control
Corrosive environmentStainless or coated contact parts and sealed bearings
Scenario differences

Different projects get different configurations

We do not apply one template to every customer. Here are three common scenarios and how the configuration changes.

Large pig farm

Focus: Reliable load reduction and solids recovery

Coarse screen + fine separator + screw press, solids to composting

Cattle farm with bedding

Focus: Fiber and grit handling

Heavy-duty screen + settling + dewatering with fiber-tolerant design

Integrated treatment project

Focus: Downstream protection

Two-stage separation sized to protect the biological plant

Implementation

From inquiry to commissioning

This is the delivery path we follow for every complete line project.

1

Confirm requirements

Raw materials, formula, capacity, bag size, utilities and site conditions are confirmed in a technical questionnaire.

2

Process design & layout

We produce a process flow, line layout and foundation drawings sized to your material data.

3

Quotation with scope

You receive a quotation with an itemized delivery scope - what is included and what is excluded.

4

Order & fabrication

Fabrication starts with progress updates; long-lead items are ordered first.

5

Factory testing

Machines are assembled and no-load tested; weighing and control systems are calibrated.

6

Export packing

Equipment is export-packed with anti-rust treatment and a packing list for customs.

7

Delivery & installation

Machines ship FOB/CIF/door-to-door; installation is supervised on site or via video guidance.

8

Commissioning & training

We commission the line, train your operators and stabilize process parameters.

9

Acceptance & after-sales

Acceptance is based on agreed metrics; spares and remote support continue after handover.

Pre-purchase checklist

What to prepare before requesting a quote

The better your information, the closer the first quote is to the final one. Prepare these items:

  • Animal type and housing/collection method
  • Wastewater flow in m3/h or m3/day and peak factor
  • TS/SS content and fiber/grit characteristics (or samples)
  • Target solids removal and downstream liquid destination
  • Solids destination (composting, transport, disposal) and moisture target
  • Site power, space and access
  • Environmental or discharge requirements for context

Request a separation system scoping

To scope your separation system, send: animal type and collection method, flow (m3/h) and peaks, TS/SS data or samples, target solids removal, solids destination and site conditions.

Product Inquiry

Tell us about your project — we reply within 24 hours (24/7).

Fields marked * are required. Your inquiry goes directly to our engineering team.

Risk boundaries

When this solution does not apply

Honest boundaries make a proposal credible. These conditions must be confirmed before the configuration is valid:

  • This is a physical separation system: it reduces solids load, it does not achieve discharge compliance by itself
  • Performance depends on real flow and TS data; without samples, quotes are preliminary only
  • High-fiber or high-grit streams may need heavier-duty internals
  • Solids disposal and composting are customer scope, but we design the interface
Effect verification

How we verify the solution works

Performance is checked with measurable indicators, not adjectives. These are the acceptance checks for this type of line:

IndicatorHow it is verified
SS removalMeasure TS/SS before and after each stage over a full day
Dewatered solids moistureCheck solids moisture at the press outlet
Hydraulic capacityRecord m3/h at design and peak flow
UptimeTrack clogging events and cleaning time over the first month
Delivery scope

What is included - and what is not

Compare quotes on the same scope. This is exactly what the project price covers.

Included

  • Screens, separators, dewatering press, pumps and control as one system
  • Flow and solids design basis
  • Layout, installation guidance, commissioning and training
  • Spare parts and after-sales support

Not included (separate scope)

  • Biological or chemical treatment stages (we size the interface for them)
  • Civil works, lagoons and disposal logistics
  • Composting equipment (separate scope; we coordinate)
  • Environmental permits
Scenario FAQ

Questions buyers ask about this solution

¿Este sistema hace que el agua cumpla estándares de descarga?
No. Realiza separación física sólido-líquido y reducción de sólidos suspendidos. Si el objetivo es cumplimiento de descarga, se requiere tratamiento biológico o químico posterior — dimensionamos el sistema en consecuencia.
¿Qué información necesita para cotizar?
Tipo de animal, método de recolección, flujo (m³/h), contenido TS/SS, fibra y arena, objetivo de remoción, destino de sólidos y líquidos, y condiciones del sitio.
What solids reduction can I expect?
At reference conditions the fine separator intercepts about 95% of suspended solids at 0.3 mm / 150 mesh. Your actual result depends on flow, fiber and grit content — we confirm with a sample-based engineering assessment.
Can the separated solids feed my compost line?
Yes. Dewatered solids can be co-composted with bedding or straw, turning a waste stream into organic-fertilizer feedstock — many customers pair this system with an organic fertilizer line.
What solids removal can I expect?
A well-designed two-stage physical system typically removes 60-85% of suspended solids depending on particle size and fiber content. We confirm the expected range after your TS/SS data - and we never claim discharge compliance.
Can the separated solids go into an organic fertilizer line?
Yes - that is the recommended route. Dewatered solids at the right moisture feed composting, and the organic line turns them into granular or powder fertilizer.
Do I need a lagoon before the separator?
An equalization or settling structure is strongly recommended for flow peaks and solids load stability. We can design the interface and advise on sizing.
Deep-dive guide

Ten angles buyers must understand before investing

Each angle is a self-contained chapter with a line illustration. Read the ones that match your project stage, then send us the data each angle asks for.

1. Materia prima de las aguas residuales ganaderas: sólidos, fibra y la carga frontal

Las aguas residuales ganaderas son una corriente alta en sólidos y fibra que debe reducirse antes del tratamiento biológico, porque los sólidos sobrecargarían las etapas aguas abajo. La separación frontal retira primero los sólidos grandes y medianos, que es la etapa física que hace funcionar el resto. El contenido de sólidos y el tipo de fibra deciden la pantalla y la deshidratación, y los caracterizamos antes de configurar. Un sistema construido para una granja porcina se comporta distinto de uno lechero, así que la materia prima es la primera entrada.

Materia prima de las aguas residuales ganaderas: sólidos, fibra y la carga frontal

2. Cribado grueso para la retirada de fibra y partículas grandes

La etapa gruesa retira la fibra larga y las partículas grandes que cegarían o desgastarían las etapas finas, usando una pantalla inclinada o un separador vibrante. Es el seguro más barato del frente, porque protege la deshidratadora y la prensa aguas abajo. La malla se fija para la longitud de fibra y el tamaño de partícula, y los sólidos se deslizan para su recogida. Un frente sin esta etapa desgasta pronto las etapas finas.

Cribado grueso para la retirada de fibra y partículas grandes

3. Máquina deshidratadora para sólidos grandes y medianos

La deshidratadora usa vibración de alta frecuencia para separar los sólidos grandes y medianos del líquido, reduciendo la carga de sólidos suspendidos al frente. La vibración evita el cegamiento, y los sólidos descargan lo bastante secos para manejar. Es el caballo de batalla de la separación física, dimensionado para el volumen diario y la carga. Su calidad de salida fija la carga de la siguiente etapa.

Máquina deshidratadora para sólidos grandes y medianos

4. Separación fina y prensa de tornillo para la deshidratación de lodos

Tras retirar los sólidos gruesos y medianos, el separador fino y la prensa de tornillo voluta terminan el líquido y deshidratan el lodo concentrado. La prensa exprime el lodo delgado en una torta manejable, a menudo sin polímero, y la voluta autolimpiante corre continua. Es la etapa de acabado que convierte los finos restantes en un sólido utilizable y un líquido listo para el siguiente paso.

Separación fina y prensa de tornillo para la deshidratación de lodos

5. Configuración de dos y tres etapas para la reducción de carga de sólidos

La separación es escalonada, porque una pantalla no hace todo el trabajo. Un sistema de dos etapas retira los sólidos gruesos y finos, y uno de tres añade la prensa para el lodo. Las etapas se dimensionan juntas para que la carga baje en cada paso y ninguna se sobrecargue. Configuramos las etapas para la composición, y el escalonado extrae la mayor agua con el menor desgaste.

Configuración de dos y tres etapas para la reducción de carga de sólidos

6. Uso de los sólidos separados y calidad del líquido para el tratamiento aguas abajo

Los sólidos separados son un producto, no un problema de eliminación: pueden compostarse o usarse como enmienda, y el líquido clarificado está listo para tratamiento biológico o aplicación al suelo. La sequedad y la calidad se declaran frente a la alimentación, porque el resultado sigue al tipo de estiércol. Es el punto económico de la separación frontal, y por eso las etapas se configuran para el uso de ambas fracciones.

Uso de los sólidos separados y calidad del líquido para el tratamiento aguas abajo

7. Paquete de bomba y control para una transferencia estable de lechada

El sistema depende de una alimentación estable, y el paquete de bomba mueve la lechada de la recogida al separador con protección de nivel, atasco y sobrecarga. La bomba de corte maneja la fibra, y el armario gestiona el arranque-parada. Una alimentación estable mantiene trabajando las pantallas y la prensa, y el paquete se dimensiona con las etapas.

Paquete de bomba y control para una transferencia estable de lechada

8. Resistencia a la corrosión y construcción húmeda

Todo el sistema corre en un entorno húmedo y corrosivo, así que las partes de contacto se seleccionan por resistencia. Las pantallas, el tornillo y la bomba se construyen para el amoníaco y la humedad, y los bastidores se recubren. Esta disciplina de material mantiene el sistema años en lugar de oxidarse, y se declara en la cotización.

Resistencia a la corrosión y construcción húmeda

9. Huella, servicios y distribución de granja para los sistemas de separación

El sistema es compacto y se dispone en el punto de recogida o delante del tratamiento biológico, con la alimentación, la salida de líquido y la recogida de sólidos en un flujo. Los servicios - energía para pantallas y prensa - son modestos, y la huella sigue al volumen diario. Dibujamos la distribución para los canales y galpones existentes, para que el sistema entre en el flujo actual.

Huella, servicios y distribución de granja para los sistemas de separación

10. Puesta en marcha y aceptación de la separación de aguas residuales ganaderas

La puesta en marcha prueba la separación con el agua residual real, no una muestra limpia. Corremos a la retirada de sólidos acordada, comprobamos la sequedad y la calidad del líquido frente a la lista, y capacitamos al personal en pantallas y prensa. Los criterios son medibles, y tras la entrega mantenemos los repuestos y el soporte remoto, porque un frente que para en temporada de lluvias inunda la granja.

Puesta en marcha y aceptación de la separación de aguas residuales ganaderas
error: Content is protected !!