Delivery time depends on the scope and the customization. Standard machines usually ship in about 15 to 30 days, complete lines typically take 45 to 90 days depending on the machine list, and large or highly custom projects can take 90 to 120 days plus the sea freight. The schedule is confirmed in the technical proposal with milestone dates, so you know what is being built and when.
The lead time is made up of design, fabrication, assembly, testing and packing, and each of those has a deliverable. We publish realistic lead times rather than optimistic ones, because a date that is promised and then missed costs the buyer more than a date that was honest from the start. The sea freight then adds the transit time to the destination port.
During the project we keep you updated at the fabrication, testing and packing milestones, so there is no long silence between the order and the shipment. For urgent orders we can often re-sequence the fabrication to shorten the critical path, and we will tell you what that costs before you decide.
The most reliable way to plan is to work backwards from the date you need the plant running, subtract the freight and the installation, and confirm the fabrication window from there. Send your required start-up date and the scope, and we will give you a milestone schedule that actually works.
The sea freight is a separate line in the schedule because the transit time depends on the destination and the port congestion, not on the factory. We state the fabrication window and the freight window separately, so you can plan the arrival realistically and see where the time actually goes.
The realistic way to shorten the delivery is to confirm the requirements early and avoid changes after the design is frozen, because every change restarts a part of the work. We flag the cut-off point for changes in the schedule, so you know exactly when a modification will start to affect the ship date. That transparency is what keeps the promised date and the delivered date the same.
Need a project-specific answer?
Send raw materials, capacity, product type and destination - our engineers reply within 24 hours (24/7).
Ask our engineersГотовы построить или модернизировать завод удобрений?
Пришлите сырьё, производительность и целевой продукт. Инженеры ответят в течение 24 часов (24/7) с конфигурацией и бюджетом.